Ponteareas - Baiona
Stage 10 of the 2024 La Vuelta Ciclista a España is a mountain stage that will take place on Tuesday 27 August 2024 at 11:42.The stage starts in Ponteareas and finishes in Baiona. Start time is 11:42 with an expected finish at 15:30 (average speed of 42 km/h).
The total distance of the stage is 159.8 km. The stage includes 4 categorized climbs and 1 intermediate sprint. The stage has a total elevation gain of 2851.8 m with the highest altitude of the stage being 792 m. The total descent of the stage is -2919.3 m.
The stage includes 4 categorized climbs and 1 intermediate sprint.
Round About is a d_round_about at 3 km (156.8 km to go).
Speed Bump is a speed_bump at 3.9 km (155.9 km to go).
Speed Bump is a speed_bump at 4.1 km (155.7 km to go).
Speed Bump is a speed_bump at 4.2 km (155.6 km to go).
Speed Bump is a speed_bump at 4.4 km (155.4 km to go).
Bridge is a d_bridge at 4.8 km (155 km to go).
Speed Bump is a speed_bump at 5.2 km (154.5 km to go).
Speed Bump is a speed_bump at 5.7 km (154.1 km to go).
Alto de Fonfria is a KOM cat. 2 climb, which starts at 12.2 km (147.6 km to go) and ends at 27.6 km (132.2 km to go). It has total distance of 15.4 km, and an average gradient of 4.2%, going from 144 to 792 meters of altitude.
Bridge is a d_bridge at 14 km (145.8 km to go).
Bridge is a d_bridge at 15.4 km (144.4 km to go).
Bridge is a d_bridge at 15.8 km (144 km to go).
D. Left Turn is a d_turn_left at 16.1 km (143.7 km to go).
Traffic Island is a traffic_island at 16.9 km (142.9 km to go).
Bridge is a d_bridge at 17 km (142.8 km to go).
Speed Bump is a speed_bump at 17.6 km (142.2 km to go).
Speed Bump is a speed_bump at 17.6 km (142.2 km to go).
Narrow Road is a narrow_road at 17.7 km (142.1 km to go).
Information is a info at 22.2 km (137.6 km to go).
Round About is a d_round_about at 35.7 km (124.1 km to go).
Round About is a d_round_about at 35.7 km (124.1 km to go).
Round About is a d_round_about at 37.1 km (122.7 km to go).
Speed Bump is a speed_bump at 39.7 km (120.1 km to go).
Speed Bump is a speed_bump at 41.4 km (118.4 km to go).
Speed Bump is a speed_bump at 42 km (117.7 km to go).
Speed Bump is a speed_bump at 43.3 km (116.5 km to go).
Speed Bump is a speed_bump at 43.9 km (115.9 km to go).
Speed Bump is a speed_bump at 44.7 km (115.1 km to go).
Bridge is a d_bridge at 45.3 km (114.4 km to go).
Speed Bump is a speed_bump at 45.7 km (114.1 km to go).
Round About is a d_round_about at 48.1 km (111.7 km to go).
Round About is a d_round_about at 48.9 km (110.9 km to go).
Round About is a d_round_about at 49.2 km (110.6 km to go).
Round About is a d_round_about at 50 km (109.8 km to go).
Round About is a d_round_about at 52.8 km (107 km to go).
Round About is a d_round_about at 59.7 km (100.1 km to go).
Round About is a d_round_about at 63.5 km (96.2 km to go).
Traffic Island is a traffic_island at 65.6 km (94.2 km to go).
Round About is a d_round_about at 66.1 km (93.7 km to go).
Speed Bump is a speed_bump at 67.8 km (92 km to go).
Speed Bump is a speed_bump at 68.2 km (91.6 km to go).
Speed Bump is a speed_bump at 68.3 km (91.5 km to go).
Round About is a d_round_about at 68.4 km (91.3 km to go).
Round About is a d_round_about at 69 km (90.8 km to go).
Narrow Road is a narrow_road at 69.2 km (90.6 km to go).
Bridge is a d_bridge at 70.2 km (89.6 km to go).
Narrow Road is a narrow_road at 70.6 km (89.2 km to go).
Narrow Road is a narrow_road at 76.1 km (83.7 km to go).
Bridge is a d_bridge at 76.2 km (83.6 km to go).
Speed Bump is a speed_bump at 77 km (82.8 km to go).
Round About is a d_round_about at 81.7 km (78.1 km to go).
Round About is a d_round_about at 83.6 km (76.2 km to go).
Bridge is a d_bridge at 83.7 km (76.1 km to go).
Speed Bump is a speed_bump at 84.2 km (75.6 km to go).
Speed Bump is a speed_bump at 85 km (74.8 km to go).
Speed Bump is a speed_bump at 85.1 km (74.7 km to go).
Speed Bump is a speed_bump at 85.3 km (74.5 km to go).
Speed Bump is a speed_bump at 85.5 km (74.3 km to go).
Speed Bump is a speed_bump at 85.6 km (74.2 km to go).
Round About is a d_round_about at 86.2 km (73.6 km to go).
Speed Bump is a speed_bump at 86.7 km (73.1 km to go).
Speed Bump is a speed_bump at 86.9 km (72.9 km to go).
Traffic Island is a traffic_island at 88 km (71.8 km to go).
Round About is a d_round_about at 88.2 km (71.6 km to go).
Traffic Island is a traffic_island at 88.5 km (71.3 km to go).
Round About is a d_round_about at 88.8 km (71 km to go).
Alto de Vilachán is a KOM cat. 3 climb, which starts at 98.4 km (61.3 km to go) and ends at 104.7 km (55.1 km to go). It has total distance of 6.3 km, and an average gradient of 5.5%, going from 35 to 381 meters of altitude.
Alto de Mabia is a KOM cat. 2 climb, which starts at 113.9 km (45.8 km to go) and ends at 120 km (39.8 km to go). It has total distance of 6 km, and an average gradient of 5.6%, going from 96 to 436 meters of altitude.
Speed Bump is a speed_bump at 128.2 km (31.6 km to go).
A Barroca is a Sprint at 128.6 km (31.2 km to go).
Alto de Mougás is a KOM cat. 1 climb, which starts at 129.6 km (30.2 km to go) and ends at 139.5 km (20.2 km to go). It has total distance of 9.9 km, and an average gradient of 6%, going from 24 to 624 meters of altitude.
Narrow Road is a narrow_road at 130.4 km (29.4 km to go).
Alto de Mougás is a Bonus sprint at 139.5 km (20.2 km to go).
Information is a info at 139.7 km (20.1 km to go).
Round About is a d_round_about at 147.9 km (11.9 km to go).
Narrow Road is a narrow_road at 150.1 km (9.7 km to go).
Bridge is a d_bridge at 150.7 km (9.1 km to go).
Information is a info at 150.7 km (9.1 km to go).
Narrow Road is a narrow_road at 151.3 km (8.5 km to go).
Warning is a warning at 153.6 km (6.1 km to go).
Round About is a d_round_about at 154.8 km (5 km to go).
The final 3 km for this stage starts at 156.8 km, has an average gradient of -0.2%, and reaching 6 m of altitude.
Round About is a d_round_about at 157.4 km (2.3 km to go).
Round About is a d_round_about at 159.2 km (0.6 km to go).